FPA100 LOGBOOK (WEEKS 6)
5 MAY 2023
ACTIVITIES
For this week, my class has done several activities such as field drainage and main drainage, replant seedlings, and adjusting our planting bed.This activity is carried out because they want to speed up the process of raising the plant beds and good water channels.This can reduce the water reservoir when it rains.
- benih ( RM140+RM60+RM35.40+RM40= RM275.40 )
- tray RM1.8x14= RM25.2
- sarung tangan RM2x100= RM200
- mini tools RM4x100 = RM400
- tukul RM7.90x8=RM63.20
- kereta sorong RM74.70 x 2 =RM149.40
- baja 1bag=50kg rm30. 1 batas=3kg = RM30x6 =RM180
- peatmoss 10kg x 2 = RM15x2
= RM30
- kapur 25kg,2bag RM90
- tali rapia 1 tali RM13 = RM26
- measuring tape RM25x4 =RM100
- parang RM16.90x8= RM135.2
- cangkul RM33x100 = RM3300
- boots RM15x100 = RM1500
- topi RM9x100 = RM900
- watering can 12liter RM20x8 = RM160
total :RM7534.40
*upah siram pokok RM460 untuk 8 hari
*1 tray =104 lubang.
104x14 tray = 1456 lubang.
1456X3 = total 4368 lubang
yang hidup=208
kos kerugian:
- peat moss 1 bag : RM15
- duit pekerja : RM460
- seed: RM140 + RM51.20
= RM191.20
- duit minyak RM20x2 = RM40
total = RM706.20
REFLECTION
For this week reflection I found out that jasin had a very hot weather and heavy rain. I hope that this type of weather will not effect our FPA100 project.
THAT'S ALL FOR ME .THANK YOU
Comments
Post a Comment