FPA100 LOGBOOK (WEEKS 6)


5 MAY 2023


ACTIVITIES


For this week, my class has done several activities such as field drainage and main drainage, replant seedlings, and adjusting our planting bed.This activity is carried out because they want to speed up the process of raising the plant beds and good water channels.This can reduce the water reservoir when it rains.





That same week, our class transplanted trees to the plant bed. The process of transplanting trees was taught by the lecturer and farm staff, Mr. Naim.





  CHALLENGES

 The challenge we face is when raising the plant beds because it takes a lot of energy to prepare them.Furthermore, after we have to hoe the wet soil and rickshaw. This is very annoying for us.


TOOLS

-MINI TOOLS
-HOE
-GLOVES

Costing

Farm Report FPA100

Costing

- benih ( RM140+RM60+RM35.40+RM40= RM275.40 )

- tray RM1.8x14= RM25.2

- sarung tangan RM2x100= RM200

- mini tools RM4x100 = RM400

- tukul RM7.90x8=RM63.20

- kereta sorong RM74.70 x 2 =RM149.40

- baja 1bag=50kg rm30. 1 batas=3kg = RM30x6 =RM180

- peatmoss 10kg x 2 = RM15x2 

= RM30 

- kapur 25kg,2bag RM90

- tali rapia 1 tali RM13 = RM26 

- measuring tape RM25x4 =RM100

- parang RM16.90x8= RM135.2

- cangkul RM33x100 = RM3300

- boots RM15x100 = RM1500

- topi RM9x100 = RM900 

- watering can 12liter  RM20x8 = RM160


total :RM7534.40


*upah siram pokok RM460 untuk 8 hari

*1 tray =104 lubang. 

104x14 tray = 1456 lubang.

1456X3 = total 4368 lubang

yang hidup=208


kos kerugian:

- peat moss 1 bag : RM15

- duit pekerja : RM460

- seed: RM140 + RM51.20

= RM191.20

- duit minyak RM20x2 = RM40


total = RM706.20


REFLECTION

For this week reflection I found out that jasin had a very hot weather and heavy rain. I hope that this type of weather will not effect our FPA100 project.



THAT'S ALL FOR ME .THANK YOU






Comments

Popular posts from this blog